Kenantepe 2005        Page 1

Datum: 587.95

Trench: D.9

Date: May 29, 2005

Work only continued very briefly by excavating with big-pick depth, and after, trench has been cleaned with a trowel. Also, all the sections were cleaned a little to be able to see the layers Filiz and I excavated so far.

Descriptive Attribute Value(s)
Date 2005-05-29
Year 2005
Has note The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data.
Dayplan-D-9-2005-05-29-A
Suggested Citation

Bekir Gürdil, Filiz I.. (2012) "D-9-2005-05-29 from Asia/Turkey/Kenan Tepe/Area D/Trench 9/Locus 39". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/90e7982e-ecf0-4568-d59f-1ff4ed7b551c> ARK (Archive): https://n2t.net/ark:/28722/k2zp41h2t

Editorial Status
●●●●○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)