project banner image
Phase I: Preparation: 1st c. BCE subterranean canalization is installed and the bedrock leveled with a coarse yellow soil. (Classification Category or Type)
Suggested Citation

Martha Sharp Joukowsky. (2007) "Phase I: Preparation: 1st c. BCE subterranean canalization is installed and the bedrock leveled with a coarse yellow soil.". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/types/d9936e14-afed-43d8-ce89-a4f156845051>

Editorial Status
●●●○○
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)