Late fill and final renovations made. The doorway is completely blocked with a very badly built wall. (Classification Category or Type)
Suggested Citation
Martha Sharp Joukowsky. (2007) "Late fill and final renovations made. The doorway is completely blocked with a very badly built wall.". In Petra Great Temple Excavations. Martha Sharp Joukowsky (Ed). Released: 2007-11-11. Open Context. <https://opencontext.org/types/12f02029-a7bc-44bd-923a-57cf24325f44>
Editorial Status
●●●○○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)