Document Content
July 11, 2001
We started by cutting down on L1060 again. I want to level it but it is quite big so it is a challenge to see anything. We took soil from the ash pit which I marked on my day plan a KT1484.
We are getting small carbon samples from L1060 as usual. They are all from basically the same elevation.
Then we also moved southward from L1056 to try to get rid of dirt from the off season. I continue to call this L1056.
Descriptive Attribute | Value(s) |
---|---|
Date | 2001-07-11 |
Year | 2001 |
Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Peter Cobb. (2012) "C-1-2001-07-11 from Asia/Turkey/Kenan Tepe/Area C/Trench 1/Locus 1055". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/f5ffa88c-401b-494e-a8e7-853000906ba1> ARK (Archive): https://n2t.net/ark:/28722/k23j3fh47
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)