Document Content
Kenantepe 2005 Page 1
Datum: 587.95
Trench: D.8
Date: June 08, 2005
Work continued only with one worker in SW sounding and the others were sent to Emmy’s D.8 to articulate the mud-brick walls and expose the preserved floors inside the rooms. After excavating about 26 cm with L.5234 in the sounding this locus has closed. Today was the last excavation day for this trench and I moved to new one to the S of D.8 called as D.10.
Descriptive Attribute | Value(s) |
---|---|
Date | 2005-06-08 |
Year | 2005 |
Has note | The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data. |
Suggested Citation
Bradley Parker, Peter Cobb. (2012) "D-5-2005-06-08 from Asia/Turkey/Kenan Tepe/Area D/Trench 5/Locus 5234". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/f4209e58-fd53-484b-45bf-dcbe1c744c73> ARK (Archive): https://n2t.net/ark:/28722/k2988744t
Editorial Status
●●●●○Part of Project
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)