Daily Trench Journal

Area C

Trench 1

June 23, 2005

Today is the last day of excavation. We are taking out the last stub of wall 1111 that had been pedestalled. We are now completely below the wall, however. We are cleaning this all up in order to HAP sample what remains of L1117.

We are also fixing the sounding. Apparently some rocks in the baulks were pedestalled.

Descriptive Attribute Value(s)
Date 2005-06-23
Year 2005
Has note The purpose of the daily journal was to record the activities taking place in a trench each day. This included which loci were excavated, how and why loci were excavated and the ongoing impressions of the relationships among loci. It should be noted that journals record the actions, impressions and ideas of trench supervisors during the excavations. They are not, therefore, the final interpretations or syntheses of the emerging data.
Dayplan-C-1-2005-06-23-A
Suggested Citation

Marie Hopwood. (2012) "C-1-2005-06-23 from Asia/Turkey/Kenan Tepe/Area C/Trench 1/Locus 1117". In Kenan Tepe. Bradley Parker, Peter Cobb (Ed). Released: 2012-03-28. Open Context. <https://opencontext.org/documents/d381b7f6-8527-4553-13d2-5e1e856d65ba> ARK (Archive): https://n2t.net/ark:/28722/k2w95549w

Editorial Status
●●●●○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)