An area due east of the S.E. Building has been cleared of trees. Brush and stones present on the ground surface were removed. The eastern-most baulk of T-26, as left by
was redefined and the washout sorted. Plastic above the floor level of the S.E. Building was uncovered. A tentative grid system was established in this area by triangulating off the system employed west of us in T-26 by . These meter readings will be checked tomorrow.Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1989-06-08 |
Entry Year | 1989 |
Start Page | 29 |
End Page | 29 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
MW V
Vocabulary: Murlo |
Suggested Citation
Matthew Wilcox. (2017) "MW V (1989-06-08):29; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/1989, ID:430". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/c57645c1-af95-4952-8cc8-8e79790883d6> ARK (Archive): https://n2t.net/ark:/28722/k2vd74g8z
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)