Document Content
Daily Log
Monday, June 15
A.M.
Soil too wet to excavate
P.M.
Resumed cleaning of backfill soil in meters K-L/63. Backfill in this area is almost entirely removed.
Initiated clearning of backfill from meters K-L(M)/69-70. Area left unfinished.
The 10 meters from the south wall of the Upper Building to the area of K-L(M)/63-70 were cleared of brush in order to check the preent coordinated of hte trench. This will be done tomorrow.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1992-06-15 |
Entry Year | 1992 |
Start Page | 15 |
End Page | 16 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
TT II
Vocabulary: Murlo |
Suggested Citation
Tony Tuck. (2017) "TT II (1992-06-15):15-16; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/1992, ID:139". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/c4dcf0de-ef70-4bb7-b182-4f36ca9d5f55> ARK (Archive): https://n2t.net/ark:/28722/k2d50x79q
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)