Document Content
Daily Log
June 16, 1986
A.M.
The soil was too wet to dig due to continuing rain all weekend. Picchetti were set out to mark grids in the existing eastern end of T-26 as well as proposed 1986 areas. The grid system will follow that used by Lacy in 1985 (See LRL Books page 6 of this book).
and , particularly the plan at the beginning of Book II) in order to make more accurate contextual associations (See also the plan and schematic sketch as per Lacy onAfter laying out of grids was completed work was continued down in the magazzino. More rain today.
P.M.
Work continued in the magazzino.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1986-06-16 |
Entry Year | 1986 |
Start Page | 32 |
End Page | 33 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
AC V
Vocabulary: Murlo |
Suggested Citation
Abbey Collins. (2017) "AC V (1986-06-16):32-33; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/1986, ID:123". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/63b6a368-2009-4eb3-bddc-a55e0b9ee394> ARK (Archive): https://n2t.net/ark:/28722/k2p84k99h
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)